First Roast Validation
Summary
After connecting a machine for the first time, run a short test roast before relying on the setup for a real roast. Check that the temperatures and labels match the machine display.
Steps
- Start a short test roast.
- Compare Bean Temp and Env Temp with the machine display or native workflow.
- Check optional readings such as gas, airflow, pressure, fan, drum, or set value if the selected machine includes them.
- Save the batch and reopen it to confirm labels and values are preserved.
- Submit a ticket if values are missing, stuck, or clearly wrong.